- Essential work involving repairs to local gas network in Grantham
- Two way traffic lights currently in place in Dysart Road, Grantham
- Work is necessary to ensure safe and reliable gas supplies are maintained to the area
Cadent engineers are currently carrying out essential work to locate and repair a suspected gas escape in Grantham.
The work is taking place in Dysart Road and two-way traffic lights have been deployed to enable the work to be carried out safely and efficiently.
It’s hoped both repairs and road reinstatement will be completed and traffic management lifted by the end of the week (Friday 9 October).
The work coincides with a number of other roadworks being carried out in the area including gas mains replacement work along with work by Network Rail in Barrowby Road.
The work needs to be carried to out to help ensure local residents keep on enjoying safe and reliable gas supplies for cooking and heating.
Local gas supplies will continue to be maintained throughout the work and local businesses will also continue to remain open as usual.
The work coincides with a number of other roadworks being carried out in the area including gas mains replacement work along with work by Network Rail in Barrowby Road.
Cadent is sorry for any inconvenience its work is causing and will do all it can to complete its work as promptly as possible.
- Suspected gas escapes should be reported on 0800 111 999* (Calls are recorded and may be monitored)
Leave a Reply
You must be logged in to post a comment.